6,000m³ Slurry Lagoon
Description
Bartlett Contractors were awarded the contract to design and excavate a new dirty water lagoon on a dairy farm near Dorchester, Dorset.
The 6,000m³ lagoon is double lined with a GCL bentonite layer underneath to form a leak detection system and a 1mm HDP liner on the surface. This ensures that the lagoon meets all environmental regulations.
Photos were taken during the finishing stages of the project, where the remains of the topsoil were going to be reinstated and graded and the fences around the perimeter of the lagoon, erected.
Description
Bartlett Contractors were awarded the contract to design and excavate a new dirty water lagoon on a dairy farm near Dorchester, Dorset.
The 6,000m³ lagoon is double lined with a GCL bentonite layer underneath to form a leak detection system and a 1mm HDP liner on the surface. This ensures that the lagoon meets all environmental regulations.
Photos were taken during the finishing stages of the project, where the remains of the topsoil were going to be reinstated and graded and the fences around the perimeter of the lagoon, erected.